Logo
Hybrid Light Tube - HyLighT
KOINA/SOLAR-ERA.NET/0313/03
Search

Work Package 5: Production feasibility and guidelines

The Work Package 5 regards the techno‐economic assessment and the final design of HyLighT. The optimal production line will be determined by taking into consideration a number of parameters that are associated with the production processes and the techno‐economic feasibility of the product, displayed as a function of replacing convectional energy sources. A set of values for HyLighT will be given according to the efficiency, the manufacturing and environmental costs of the product, as well the current price ranges of the energy market. The optimal production lines and disposal processes encouraging energy efficiency and waste minimisation will also become available. Aesthetic aspects of the proposed solution will also be analysed in terms of this work package. WP5will also assesses the environmental implications associated with the manufacture and operation of the final product.

This work package will be leaded by the FHO, and the deliverable report will be produced under its coordination. The role of HO in this work package regards the environmental implications associated with the manufacture and operation of final product while the role of PA1 in WP5 will mainly focus on the production line flexibility requirements to fulfil different aesthetic and technical aspects of the proposed solution.